Legacy ERP Process Modernisation

A dated baseline, a documented source-to-target mapping, and parity-tested cutover — moving a reporting layer off Google Sheets onto a governed Microsoft stack, without touching the source ERP.

Implemented and ongoing
Business context

A monthly reporting process sitting downstream of SAP export data had grown up inside a particular platform — a Google Sheets and Apps Script environment — over an extended period. That platform needed replacing with a more governed stack, without changing SAP itself and without losing continuity with what the process had always produced. Scope boundary, stated precisely: this modernises the reporting/process layer that sits on top of SAP export data — not SAP itself, and not any ERP code. "ERP" in this title refers to the legacy platform this reporting process depended on, not a change inside the ERP system of record. A different angle on this same underlying platform — the reverse-engineering of the reporting logic itself — is covered in the companion case study, Spreadsheet-Dependent Operations to Intelligent Business Applications.

The operational problem

The existing process's logic lived inside a specific platform's live definitions, with no durable, dated record of exactly what version of that logic was running at a given point in time. Migrating a process like that "by eye" — rebuild it on the new platform and hope it matches — risks silently changing the output in a way nobody notices until a month-end number doesn't reconcile.

Why existing processes are insufficient

Without a frozen baseline of what the old platform actually produced for a given input, there is nothing fixed to test a new platform against. A migration with no baseline has no way to prove, after the fact, that nothing changed — only an assertion that it probably didn't.

Proposed solution

Capture a dated baseline of the old platform's live definitions and execution payloads before any migration work starts. Build a documented source-to-target mapping as the platform changes. Write a migration plan with explicit, stated acceptance criteria. Run parity tests that confirm the new platform reproduces the old platform's output on the same inputs before cutover is permitted to happen.

Solution architecture

   Old platform (Google Sheets / Apps Script)
   live definitions + execution payloads
                │
                ▼
     ┌─────────────────────────┐
     │  Dated baseline snapshot   │
     │  (M0-Baseline, captured    │
     │  before migration work)    │
     └─────────────────────────┘
                │
                ▼
     ┌─────────────────────────┐
     │  Source-to-target mapping  │
     │  (Google → Microsoft)      │
     └─────────────────────────┘
                │
                ▼
     ┌─────────────────────────┐
     │  New platform              │
     │  (Microsoft / SQL Server   │
     │  stack)                     │
     └─────────────────────────┘
                │
                ▼
     ┌─────────────────────────┐
     │  Parity test harness:       │
     │  same inputs through both  │
     │  platforms, outputs diffed │
     └─────────────────────────┘
                │
                ▼
     ┌─────────────────────────┐
     │  Acceptance criteria gate   │
     └─────────────────────────┘
                │
                ▼
             Cutover
  1. Step 1
    Old platform: Google Sheets / Apps Script
  2. Step 2
    Dated baseline snapshot (M0-Baseline)
  3. Step 3
    Source-to-target mapping
  4. Step 4
    New platform: Microsoft / SQL Server
  5. Step 5
    Parity test harness
  6. Step 6
    Acceptance criteria gate → cutover
Data and application integrations

Input: the same SAP export files the reporting layer already consumed before migration — no change to SAP, no new SAP connectivity introduced by this project. Baseline: a dated snapshot of the old platform's live definitions and execution payloads, captured before any migration work began. Mapping: a documented source-to-target mapping translating the old platform's sheet- and script-level constructs to their equivalents on the new platform.

Technology stack
  • Old platform: Google Sheets and Apps Script (migration source)
  • New platform: a Microsoft/SQL Server stack
  • Dated baseline-capture artefact
  • Documented source-to-target mapping
  • Parity-test harness (field-by-field comparison)
  • Migration plan with stated acceptance criteria
End-to-end workflow
  1. 1
    Capture baseline

    A dated baseline snapshot of the old platform's live definitions and execution payloads is captured before any migration work starts (recorded snapshot: 2026-10-21).

  2. 2
    Map

    A source-to-target mapping documents how each old-platform construct maps to its equivalent on the new platform.

  3. 3
    Plan

    A migration plan sets out scope, sequencing, and explicit, stated acceptance criteria for what "done" means.

  4. 4
    Build

    The new platform is built against that mapping.

  5. 5
    Run parity tests

    Parity tests run the same inputs through both platforms and compare outputs directly.

  6. 6
    Investigate

    Discrepancies are investigated against the baseline snapshot and the mapping — not guessed at or waved through.

  7. 7
    Cut over

    Cutover is gated on meeting the documented acceptance criteria. The baseline and the parity tests are the proof that cutover is safe, not a sign-off given on faith.

Implementation methodology

The baseline is captured before touching anything, because without a frozen "before" state there is nothing fixed to prove the "after" state against. This is the same governance instinct as the reverse-engineering work covered in the companion case study — never trust a single pass at matching old to new; capture it first, map it explicitly, then test it against the frozen record rather than against memory of how the old platform behaved.

Security and governance

The baseline snapshot, the source-to-target mapping, and the migration plan with its acceptance criteria are durable, dated artefacts — not a single undocumented claim that the migration "went fine." No SAP credentials or SAP system access are touched by this work; the boundary is explicit: this is the reporting/process layer sitting on top of SAP exports, not SAP itself.

Deployment considerations

Cutover from the old platform to the new one is gated on the documented acceptance criteria being met, confirmed by parity testing against the baseline — not on a target date alone. The scope is, again, the reporting/process layer only; no ERP code or SAP configuration is in scope for this migration.

Expected operational benefits

A reporting process no longer dependent on the continued existence of one specific platform.

A documented, provable path from the old platform's behaviour to the new one's, rather than an undocumented one-time swap.

No time or cost figure is stated — none has been measured, and none exists on record for this engagement.

What makes this technically challenging

Capturing a faithful baseline of a live, organically-grown process — not just its formulas, but its actual execution payloads at a point in time — before it changes under you during the migration itself, and then proving equivalence between two different platforms field by field rather than asserting that a rebuild "looks right." Doing this at the scale of a reporting process this large, with a dated snapshot as the anchor, is what separates a provably safe cutover from a hopeful one.

Implemented and ongoing

Status: Implemented and ongoing. A dated baseline snapshot, a documented source-to-target mapping, and a migration plan with stated acceptance criteria exist; parity testing has been used to validate the new platform's output against the old platform's output ahead of cutover. No measured customer outcome — time saved, error reduction, or otherwise — exists on record for this engagement. This is the modernisation of the reporting/process layer built on top of SAP export data; it is not a change to SAP itself or to any ERP code, and this page does not describe it as such.