Industry

Decision-support AI for regulated plants — never the one approving the batch.

Pharma manufacturers run on SAP, a QMS and a quality unit that signs everything. We build the reporting, review-triage and data-integrity layer around that reality — read-only, audit-logged, and deliberately kept out of GxP-critical decisions.

What's broken

Pharma quality teams keep hearing that AI will speed up batch review and deviation handling, from vendors who don't mention Part 11, ALCOA+, or who's accountable when the model is wrong. The EU's draft GMP Annex 22 is drawing a hard line on this: dynamic or generative AI models should not be used in critical GMP applications. Most "AI for pharma" pitches skip that line entirely, or bury it in a footnote.

What we do differently

We design to the boundary instead of around it. Every output we produce is attributable to a model version, a prompt, and a named human reviewer. Nothing we build makes a GxP-critical decision on its own — not because a regulator told us to say that, but because it's the actual scope of what we offer.

The boundary

We do not propose generative AI for GxP-critical decisions. Our pharma work is human-reviewed, audit-logged, decision-support only: batch-record pre-checks, deviation/CAPA triage and drafting, reporting, and data-integrity tooling. Never automated disposition, never automated release.

Common friction
  • —Batch record review means reading the entire record, not just the exceptions
  • —Deviations and CAPAs back up, and repeat deviations are spotted by memory, not by search
  • —Data-integrity findings are the single most common thing in recent FDA warning letters, and Indian sites are cited at a markedly higher rate
  • —Revised Schedule M is forcing documentation and CAPA discipline onto a budget most MSME units don't have
  • —Quality teams won't trust a tool that can't show an inspector its audit trail
  • —Management and quality KPIs are rebuilt by hand from SAP and the QMS every reporting cycle
Where automation and AI fit
  • Plant MIS & quality KPIs on SAP and QMS data
  • Deviation/CAPA triage and drafting assistant
  • Audit and inspection-readiness packs
  • Data-integrity and ALCOA+ governed pipelines
  • SAP data integration & analytics
  • Enterprise data engineering

Before → After

Before
  • — QA reads the full batch record because review-by-exception isn't built
  • — Repeat deviation patterns are spotted by memory, not by search
  • — Quality and MIS KPIs are rebuilt by hand from SAP and the QMS each cycle
After
  • — Completeness gaps and cross-field inconsistencies surfaced for the reviewer, who still reviews
  • — Similar and repeat deviations flagged with the supporting evidence attached
  • — A quality and MIS report traced to source, every run logged

Pain → Practice → Outcome

QA reviews the entire batch record because review-by-exception isn't built
Enterprise AI & Agentic Systems
A pre-check surfaces completeness gaps and cross-field inconsistencies for the reviewer to act on; the reviewer still reviews and signs.
Deviations and CAPAs back up, and repeat patterns are spotted by memory
Enterprise AI & Agentic Systems
Similar-event search and a drafted narrative go to QA for edit and approval — the triage step is logged, the decision stays human.
Quality and management KPIs are rebuilt by hand from SAP and the QMS every cycle
SAP Data Integration & Analytics
Cycle time, right-first-time and deviation ageing are computed once from the same extracts your team already pulls, reconciled against the manual version.
Data-integrity gaps are the most commonly cited warning-letter finding, and no one has time to self-audit for them
Enterprise Data Engineering
Every pipeline we build ships with independent reconciliation controls, hash-verified lineage and a run ledger — an audit trail an inspector can follow.
MSME units face Revised Schedule M's documentation and CAPA bar on a tight budget
Legacy Application Modernisation
Excel- and SAP-export-driven quality processes are reverse-engineered into a documented, tested pipeline instead of a new system you have to buy and validate from scratch.

Questions we actually get

Is this validated, and will an inspector accept it?+

We're not a validated QMS, MES or LIMS vendor, and we won't claim to be. What we provide is an intended-use statement, audit logs, model version-pinning and traceability evidence — the inputs your quality unit needs to make its own validation and acceptance call. Accountability for that call stays with you, as it should.

Does this use generative AI to review or release batches?+

No. Read the boundary above again — that's not a simplification for the FAQ, it's the actual scope. Decision-support and drafting only; a named human reviews and signs everything that matters.

What about Part 11, Annex 11 and ALCOA+?+

Every AI input and output — prompt, retrieved context, model version, reviewer, timestamp — is attributable and retained in an immutable store, never silently overwritten. That's the design pattern, not a compliance claim we're making on your behalf; your quality unit still owns the formal assessment.

Where does our data go? Can it leave the plant?+

Our default posture is client-tenant or on-prem deployment, with no training on client data. Confirm specifics for your engagement — we're not going to give you a universal answer that doesn't hold for every deployment shape.

Is the EU's Annex 22 ban on generative AI in critical GMP final?+

No — as of our most recent research, it was still in draft, with final text targeted for later in 2026 and the exact boundary still being discussed by regulators. We've built our posture to the stricter draft reading regardless of how the final text lands.

Do you replace our QMS, LIMS or MES — Veeva, TrackWise, MasterControl, Werum PAS-X?+

No. We are not a QMS/MES/LIMS vendor and we integrate with what you already run, we don't replace it.

When we're not the right fit

If you want AI to make or recommend a batch disposition or release decision, that's off the table under our own stated boundary — not a regulatory technicality we might relax. If your first requirement is a certified, vendor-validated QMS/LIMS/MES replacement, you need that vendor, not us. And if your plant is paper-only with no SAP or QMS extract to start from, the data-integration groundwork has to come before any of this.

Related work
Other industries